Green Mark Verification
Verification is the last step of the Green Mark Certification process. Its objective is for building developers or owners to demonstrate compliance with the committed design specifications in terms of implementation of green features, site installation, control strategies and energy savings over code-compliant buildings.

For Projects Using GM Criteria Before GM2021
Verification in 2 Stages
Please refer to the workflow [PDF, 687 KB], submit the relevant documents and calculate the necessary scores before on-site verification.
Stages of verification
Stages | New & Existing Non-residential buildings | Residential buildings |
|---|---|---|
Stage 1 | You must determine the functionality and performance of the green features that resulted in the certification and demonstrate compliance with the committed design specification through documentary evidences and site verification. Verification officer(s) will inform the need for site verification if needed after reviewing submitted documents. | |
Stage 2 | This stage applies only to Green Mark GoldPLUS and Platinum non-residential projects with energy modelling. You must determine the energy savings for the building over its reference model using 12-month actual operation data and show compliance to the committed energy savings that resulted in the certification. | N.A. |